The City of Cedar Hill conducted a Water and Wastewater Master Plan Update (PDF) in 2012. The goals of this Plan were to evaluate the capacity of the existing water and wastewater systems and to recommend a phased Capital Improvements Plan through buildout. With Cedar Hill's projected population growth and commercial development, the recommendations will serve as a basis for the design, construction, and financing of facilities required to meet the City's water and wastewater service needs. The Plan discusses major elements such as:
- Updating the existing hydraulic models
- Developing water and wastewater load projections
- Elevated Storage Tank Operational Analysis
- Identifying system improvements through Buildout
- Developing a phased Capital Improvements Plan
- Preparing a Water and Wastewater Master Plan Report
The following are the chapters of the Water and Wastewater Master Plan:
- Executive Summary
- Introduction
- Scope of Work
- List of Abbreviations
- Population
- Water Demands
- Historical Water Demands
- Projected Water Demands
- Water System Analysis
- Existing Water Distribution System
- Water Model Update
- TCEQ Requirements
- Storage and Pumping recommendations
- Water Supply Evaluation